Penmann recently finalised a significant HVAC upgrade at Danone Nutricia's Liverpool-based production site, supplying a purpose-built ventilation and climate control system engineered to meet strict hygiene and production standards. The scope encompassed the complete lifecycle delivery of high-specification HVAC systems across non-production, Medium Care (MC) and High Care (HC) areas. https://wavesocialmedia.com/story6319711/the-penmann-team-finalises-specialist-hvac-installation-for-nutricia-s-production-facility-in-liverpool-in-line-with-fsi-phase-1-and-2