As viewed from the determine underneath, constant auger is used to drill the borehole, carry up drilled soil, and pour concrete when the auger is moved up. Due to this fact, the borehole isn't going to need casing or hydrostatic stress to prevent damage to the borehole wall. From a https://holdenovqjb.win-blog.com/13001457/5-simple-techniques-for-cast-in-situ-piles