In this technique, a round gap is excavated up on the depth at which the soil will stand unsupported (about 0.5m for comfortable clay and 2m for stiff clay). Vertical boards generally known as laggings, are then set in place around the excavated encounter and are held tightly against the https://connermznvd.blogsidea.com/36947476/what-does-pile-foundation-services-bangladesh-mean