A second coat will likely be advised for sturdiness, having said that, the damp film thickness of the 1st topcoat will impact the dry time along with your ability to recoat. A traditional recoat time is within just 3 to 4 hrs—any more between topcoats would require additional sanding https://directorydepo.com/listings107230/the-best-side-of-floor-sanding-and-polishing-service